We – EPG Team the biggest agricultural gearbox and pto manufacturing unit in China with 5 various branches. For a lot more information: Cell/whatsapp/telegram/Kakao us at: 0086-13083988828
2009 jeep liberty front drive shaft Our pto shaft tubing merchandise 2009 jeep grand cherokee front generate shaft is 540 to one thousand pto adapter tractor offer popular vw polo travel shaft exported pto gear reduction box to what length pto shaft do i require the pto oil seal substitution United pto shaft yoke replacement States, pto quick coupling Germany, Australia, Russia, Spain, Hungary, Zimbabwe, Ukraine, Nigeria, Peru, Brazil, Middle and South The usa, Thailand, Pakistan, Indonesia, much more than sixty international locations and regions. “EPG” brand name rotocultivator ploughshares in T.S. complete traces created in our factory have been analyzed and appraised by the Ministry of Agriculture and have obtained the license of popularizing farm machinery promulgated by the Ministry of Agriculture of the People’s Republic of China.
Substantial Force Cleaning 4X2 Sewage Suction Tanker Truck
1. Strengthen the tank to just take stress when operating
2. Truck with lifting program and rear door could be open to thoroughly clean residue out of tank.
Loading potential | 10 m3 |
Push kind | 6×4, RHD(or RHD) |
Engine | Cummins B190 |
Rated electrical power | one hundred ninety HP |
Total proportions (LxWxH) | 8250x2490x3300 mm |
Taxi | Driver + 2 Travellers ,1 sleeper |
Tyres x Quantity | 10.00-twenty |
Steering | ZF8118 |
Transmission | 8Forward Gears 1 reverse equipment |
Tank Construction | horizontally mounted tank with domed finishes, Inside welded surge baffles Complete tank length sub body with aspect walks, Obtain ladder to best inspection go over Sub frame integral with tank & dismountable from chassis Lockable swift release locking system on inspection go over |
Pumping Equipment |
Electricity Source : Driven by major motor by means of PTO shaft. Pump Equipment: Vacuum force gauge, Automatic strain reduction valve, Computerized vacuum reduction valve, one hundred mm diameter wire reinforced rubber suction hoses with swift release couplers at ends, One particular hose with 100mm metal pipe at one particular stop for dipping into effluent load, Pump ingestion air filter, Moisture trap/secondary shut off valve. |
Packaging & Shipping
one. Package deal: Nude and waxed by bulk cargo ship or Ro-Ro ship or flet deck.
We use greatest transportation answer to help save your sea freight price.
2. Shipping and delivery time: 30 times after deposit
Other individuals product
Make contact with: Grace Wang
Phone: () 183 5414 5160